Getting the engine out was easier then i expected. With the both of us on each end of the engine and gear box we managed to maneuver them both out as a whole.

Once out, we then separated the transmission from the engine and then begun to pick of the bits and pieces we needed to finish off building the new engine. When the new engine was ready we swapped them over so that the old engine was on the engine stand and the new engine was on the tyres on the ground. Then we put on the balanced flywheel to the balanced crank and crank pulley and also my new extreme HD clutch. Putting the transmission back on seemed to be quite difficult but that may have been because it was 1AM.


Once that was done we then lowered the new engine into place. We did have some issues with lining the engine mounts up but we eventually got it all in.