
2012 Track Dates - MX-5 Club of NSW
Moderators: -alex, miata, Andrew, Midori, Charlie Brown
-
- Forum Guru
- Posts: 4897
- Joined: Mon Apr 24, 2006 7:27 pm
- Vehicle: NA8
- Location: Moruya, NSW
Re: 2012 Track Dates - MX-5 Club of NSW
So who decided the new north circuit would be a Wanneroo (Barbagallo) imitation? 

’95 NA8
- Guran
- Speed Racer
- Posts: 3754
- Joined: Sun Feb 15, 2009 6:42 pm
- Vehicle: ND - 1.5
- Location: Albion Park NSW
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
After the supersprint on 12th/13th November, I took some photos of the construction works for the new South Circuit extension at Eastern Creek. It's coming along nicely! If we count the old turn 7 as "turn 1" on the new circuit, then there are a total of 13 turns.
This shows the old turn 7 in the foreground (turn 1 for the new track), and the new track twists up the hill. Turn 1 is a left, then turn 2 a right is not cut yet, then you can see the lefthand turn 3, and turn 4 right-hander crests the hill.

IMG_2560 by Guran5, on Flickr

IMG_2562 by Guran5, on Flickr
Viewed from next to turn 4. You've got the fast lefthand sweeper (turn 5) that goes downhill, to a tight hairpin (turn 6). The track then doubles back towards turn 4, with a drop in elevation of several metres. This'll be a great spot for photos!

IMG_2563 by Guran5, on Flickr
After the lefthand hairpin (turn 6), there's a sharp right (turn 7) before the track climbs through turn 8 kink to the right, and rejoins the old track at Corporate Hill (old turn 8 )

IMG_2565 by Guran5, on Flickr
The Supersprint presentation day on 26th February will be my first opportunity to sample the new south circuit. Looking forward to it!
This shows the old turn 7 in the foreground (turn 1 for the new track), and the new track twists up the hill. Turn 1 is a left, then turn 2 a right is not cut yet, then you can see the lefthand turn 3, and turn 4 right-hander crests the hill.

IMG_2560 by Guran5, on Flickr

IMG_2562 by Guran5, on Flickr
Viewed from next to turn 4. You've got the fast lefthand sweeper (turn 5) that goes downhill, to a tight hairpin (turn 6). The track then doubles back towards turn 4, with a drop in elevation of several metres. This'll be a great spot for photos!

IMG_2563 by Guran5, on Flickr
After the lefthand hairpin (turn 6), there's a sharp right (turn 7) before the track climbs through turn 8 kink to the right, and rejoins the old track at Corporate Hill (old turn 8 )

IMG_2565 by Guran5, on Flickr
The Supersprint presentation day on 26th February will be my first opportunity to sample the new south circuit. Looking forward to it!

Standard 2006 NC - YouTube
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
- Guran
- Speed Racer
- Posts: 3754
- Joined: Sun Feb 15, 2009 6:42 pm
- Vehicle: ND - 1.5
- Location: Albion Park NSW
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
The 2012 calendar has been locked in with one change and one new addition noted in italics below:
The Natmeet trackday does not count towards the 2011/12 Championship Pointscore. All competitors at this trackday must run on street tyres (R-specs not permitted).
Guran wrote:http://www.mx5.com.au/nsw/PDF%20Content/Motor%20Sport/Date2012.pdf
Mark 'em in your calendar!
Sunday 19th February - Wakefield Park
Sunday 8th April - Natmeet Track Day - Wakefield Park
Saturday 12th May - Eastern Creek South #
Sunday 3rd June (Supersprint Round 3) - Wakefield Park #
Monday 4th June - Wakefield Park
Saturday 30th June - Interstate Challenge Phillip Island #
Sunday 29th July - Wakefield Park
Saturday 27th October - Eastern Creek South #
Sunday 2nd December - Wakefield Park
# To be run under CAMS Permits (CAMS L2S License required)
The Natmeet trackday does not count towards the 2011/12 Championship Pointscore. All competitors at this trackday must run on street tyres (R-specs not permitted).
Standard 2006 NC - YouTube
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
- Hammer
- Speed Racer
- Posts: 2849
- Joined: Fri Apr 25, 2003 11:00 am
- Vehicle: NB SP
- Location: Sydney
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
Eastern Creek, Awesome!
I haven't raced in EC before. So it'll be great to finally experience it.
I haven't raced in EC before. So it'll be great to finally experience it.
H@mmer - 1994 Clubman | 2002 SP

GO TOPLESS!!!

GO TOPLESS!!!
- greenMachine
- Forum Guru
- Posts: 4147
- Joined: Thu Apr 24, 2003 11:00 am
- Vehicle: NB SE
- Location: Sports car paradise - Canberra
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
The North Circuit gets the infrastructure it seems. What arrangements are proposed for pits, control tower, garages etc for the South Circuit?


I never met a horsepower I didn't like (thanks bwob)
Build thread
NB SE - gone to the dark side (and loving it
)
Build thread
NB SE - gone to the dark side (and loving it

- Guran
- Speed Racer
- Posts: 3754
- Joined: Sun Feb 15, 2009 6:42 pm
- Vehicle: ND - 1.5
- Location: Albion Park NSW
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
Bad news ... the MX-5 Club's Event Calendar has the following update:
12th May 2012 *** CANCELLATION OF CLUB TRACK DAY - at Eastern Creek (South)
Unfortunately development of the Eastern Creek South Circuit and its facilities has fallen behind schedule and the current expected opening date is now 1 July 2012. This means the cancellation of this Club Track Day. There are tentative plans to provide an alternative event. (This notification as at 1 Feb 2012)
Standard 2006 NC - YouTube
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
-
- Driver
- Posts: 30
- Joined: Sat Nov 26, 2011 6:29 pm
- Vehicle: NA6
- Location: Central Coast
Re: 2012 Track Dates - MX-5 Club of NSW
Sad to hear, it would have been good to test out the new format. I was at EC a couple of weeks ago and TBH I'm not surprised the date has been pushed back as there seemed to be a fair bit of work still to do and I'm sure the continuous rain hasn't helped them.
Never Lift!!
-
- Fast Driver
- Posts: 392
- Joined: Mon Nov 07, 2011 6:14 pm
- Vehicle: NC
- Location: Blue Mountains
Re: 2012 Track Dates - MX-5 Club of NSW
Well according to club website the EC track day is out because of the EC South circuit being incomplete, due to all the wet weather we have had.
chris

chris
- Guran
- Speed Racer
- Posts: 3754
- Joined: Sun Feb 15, 2009 6:42 pm
- Vehicle: ND - 1.5
- Location: Albion Park NSW
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
Our first run at the new south circuit may have been delayed by the wet weather, but we're getting closer to having a new track. NearMap has nice aerial photographs showing the progress of track construction at Eastern Creek for the new south circuit. The realignment of the old turn 7 is just about complete, and the junction at the old turn 8 is now laid. Looks like a fair bit of work has been done on the runoff areas.
Some more (old) news and photos are on the ARDC website.
Turn 7 - Before

EC_1_20111023 by Guran5, on Flickr
Turn 7 - After ... and goodbye turn 6

EC_1_20120205 by Guran5, on Flickr
Turn 8 - Before

EC_2_20111023 by Guran5, on Flickr
Turn 8 - After

EC_2_20120205 by Guran5, on Flickr
Some more (old) news and photos are on the ARDC website.
Turn 7 - Before

EC_1_20111023 by Guran5, on Flickr
Turn 7 - After ... and goodbye turn 6

EC_1_20120205 by Guran5, on Flickr
Turn 8 - Before

EC_2_20111023 by Guran5, on Flickr
Turn 8 - After

EC_2_20120205 by Guran5, on Flickr
Standard 2006 NC - YouTube
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
-
- Racing Driver
- Posts: 858
- Joined: Wed Jun 17, 2009 8:59 pm
- Vehicle: NA6
- Location: Sydney
Re: 2012 Track Dates - MX-5 Club of NSW
No way, turn 7 was probably my favourite turn on any track I've dríven to date; so much fun to go in to!! But this new track does look like a bit of fun
- Guran
- Speed Racer
- Posts: 3754
- Joined: Sun Feb 15, 2009 6:42 pm
- Vehicle: ND - 1.5
- Location: Albion Park NSW
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
At the CAMS Supersprint presentation evening on Saturday, I had a quick chat with Evan Jones from ARDC. Evan said that the final surfacing of the south circuit was due to be laid this week, weather depending. The new track is due to be available for use in June as part of the full circuit, and independent use of the South Circuit is due in August (including independent facilities). Unfortunately I didn't have time/daylight to look at the works while I was there.
More news on the track construction is HERE.
More news on the track construction is HERE.
Track Construction Update
11 April 2012
With the final base course of asphalt laid and safety walls with tyre barriers in place the South Circuit is back on track to meet its June completion date. The final race surface material will be laid in late April. This work will be followed by the construction of run off areas, the planting of trackside grass and the placement of flag points. It is hoped the new South Circuit section will be first used in conjunction with the existing full circuit at the NSW Motor Race Championships on June 9 & 10, 2012.
Standard 2006 NC - YouTube
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
- Guran
- Speed Racer
- Posts: 3754
- Joined: Sun Feb 15, 2009 6:42 pm
- Vehicle: ND - 1.5
- Location: Albion Park NSW
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
NearMap has added new aerial photographs of the freshly laid South Circuit, dated 9th May 2012. Check it out!

Sydney Motorsport Park GP South by Guran5, on Flickr

Sydney Motorsport Park GP South by Guran5, on Flickr
Standard 2006 NC - YouTube
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
- oztrackdays
- Fast Driver
- Posts: 379
- Joined: Mon Mar 16, 2009 9:48 pm
- Vehicle: NB8B
Re: 2012 Track Dates - MX-5 Club of NSW
http://www.nearmap.com/?q=Sydney%20MotorSport%20Park@-33.803427,150.874783&ll=-33.805326,150.873656&z=17&t=h&nmd=20120509
Cheers for that a direct link for after you sign up.
Cheers for that a direct link for after you sign up.
M O N D A ... MX5 Powered by K24 Honda Power BUILD THREAD -> http://mx5cartalk.com/forum/viewtopic.php?f=57&t=63786
- Guran
- Speed Racer
- Posts: 3754
- Joined: Sun Feb 15, 2009 6:42 pm
- Vehicle: ND - 1.5
- Location: Albion Park NSW
- Contact:
Re: 2012 Track Dates - MX-5 Club of NSW
You don't need to sign up. Click on the orange button at the bottom of the webpage:
https://www.nearmap.com/welcome-new
https://www.nearmap.com/welcome-new
Standard 2006 NC - YouTube
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
WP 1:11.89 | SMP-S 1:05.90 GP 1:54.93 N 1:18.09 L 2:22.49 | PW 1:02.52
PI 2:00.55 | W-S 1:12.44 W-L 1:43.36 | SR 1:33.25
-
- Racing Driver
- Posts: 858
- Joined: Wed Jun 17, 2009 8:59 pm
- Vehicle: NA6
- Location: Sydney
Re: 2012 Track Dates - MX-5 Club of NSW
So when is the first MX5 club day using the new circuit?
Return to “New South Wales/ACT”
Who is online
Users browsing this forum: No registered users and 3 guests