What a hot weekend, stop working in the shed when could not find where I had placed tools not 5 mins later. Shed recorded almost 46° most of the day. BOM has Amberley at 42.3° at 1430 and 39.8° at 1200

Only got half the work planned done...
- Remove injectors - done. However dropping a spacer added to the job duration

- Do wheel measurements to find a 15x8 rim that fits the NB8B. Yes 6UL's fit and the Advanti Racing from MX5Parts fit, but looking at BC Racing ones - Done.
- Investigate rubbing passenger side front. Done, need to lengthen shock length after 18/02 track day
- Install 'normal' muffler as QR does not have noise restrictions - done
- Fix up splitter level - not done
- Done a general inspection underneath and around the car prior to next track day - not done
However did do some unplanned jobs:
- Removed vacuum lines as booster no longer installed. Need to order some bungs to blank off the holes.
- Installed vacuum line into air box for future testing purposes. This line was previously used to monitor brake booster vacuum.
The offending spacer. Tess and I spent almost 30 mins looking for it, was just about to take the splitter and undertray off and spotted it.
DSCN4046 by
Eipeip, on Flickr
DSCN4042 by
Eipeip, on Flickr
It is made of aluminium so could not use a magnet to fish it out
DSCN4047 by
Eipeip, on Flickr
But a nifty little hook worked. I would not make a surgeon

DSCN4049 by
Eipeip, on Flickr
Injectors removed, vacuum lines still installed. These were a 'pain' to remove due to restricted space.
DSCN4051 by
Eipeip, on Flickr
Ended up taking the throttle bracket off to get to the last of the vacuum lines
DSCN4050 by
Eipeip, on Flickr
Out and ready for cleaning
DSCN4052 by
Eipeip, on Flickr
All covered waiting...
DSCN4053 by
Eipeip, on Flickr
Inside passenger wheel well, more than likely rubbing caused by alignment (negative camber). Will reset damper length next weekend
DSCN4054 by